Dimi's extension

Hautes Fagnes
© crahayjamaigne
© crahayjamaigne
© crahayjamaigne
© crahayjamaigne
© crahayjamaigne
© crahayjamaigne
© crahayjamaigne
© crahayjamaigne
© crahayjamaigne
© crahayjamaigne
Architects
crahayjamaigne
Location
Hautes Fagnes
Year
2019

The project located in the Hautes Fagnes is the first office building in Belgium to be certified Passive-Zero energy.

At the beginning of 2010, crahayjamaigne architects won the competition for the study and construction of the new office for Dimi, a food company.

In 2016, the food company consulted the crahayjamaigne architects to design an extension which must harmonize with the existing office of 2010.

Both constructions are passive and are intended to be an ecological reference through the materials used (wooden structure, wood cladding, cellulose insulation, wood fiber panels, natural stone, …) and technologies (regulation of the temperature via reversible heat pump and chilled beam coupled with the double flow CMV, photovoltaic solar panels, domestic hot water via heat pump, automated solar protection, presence detectors, automatic management of light intensity, LED lighting, ...).

Related Projects

  • Gebäudeadaptierungen Rathausbereich - Zwentendorf
    maul-architekten zt gmbh
  • FON - Housing and Kindergarten Fontanastrasse
    GERNER GERNER PLUS
  • GOLD - Housing Goldberg
    GERNER GERNER PLUS
  • BENE - Housing Benedikt
    GERNER GERNER PLUS
  • PUCH - Housing Puchsbaumgasse
    GERNER GERNER PLUS

Magazine

Other Projects by crahayjamaigne

crahayjamaigne's office
Malmedy
Groe's house
Eupen
Transformation and Extension Hahe
Heusy
Jach's house
Malmedy
Mabau's house
Florennes